2018 ARRL FIELD DAY Results
RESULTS: Log submitted: Score: 1,838 Bonus Points: 1,260 >> TOTAL: 3,098
- — 80 m > 85 CW, 28 Digital, 0 Phone
- — 40 m > 98 CW, 60 Digital, 0 Phone
— 20 m > 7 CW, 30 Digital, 93 Phone - — 15 m > 41 CW, 0 Digital 0 Phone
- — 10 m > 0 CW, 0 Digital, 63 Phone
- GOTA 65 Phone
TOTAL = 231 CW, 118 Digital, 221 Phone
2018 ARRL FIELD DAY Plan
Click here to sign up for Field day events. Sign Up Page
DATE: JUNE 23, 2018 Saturday
__ Set up > 09:00 AM (1100 hours), Operation starts > 2:00 PM (1400 hours), Food > 5:00 PM (1700 hours) in the Field House at end of stadium.
DATE: JUNE 24, 2018 Sunday
__Operation continues, Operation ends > 2:00 PM (1400 hours), Clean up begins > 2:00 PM (1400 hours) till completed
LOCATION: Strom Thurmond High School Stadium, near 1131 Columbia Road, Johnston, SC 29832
Field Day Site survey completed by KM4TWA, KK4DID and KM4GLW.

Strom Thurmond High School Stadium
GPS: 33.808233, -81.865687
Near: 1131 Columbia Road, Johnston, SC 29832
GRID SQUARE: EM93bt
TRAILER: Parked in tunnel at 50 yard line. HF VHF/UHF ICOM IC-7100 Radio (Station one, rear room) and ICOM IC-7300 radio (Station two, front room). Operators may bring their own radios.
Station ONE: Primarily voice, located in EMA trailer main room in rear,
Station TWO: Primarily CW, operator selected location. In PRESS BOX at top of stadium or EMA trailer front room. ICOM IC-7300 in both locations.
GOTA station located in press box of stadium, ICOM IC-7300.
Edgefield Emergency Management training trailer.
__ Trailer has internal generator and air conditioning.
ON SITE COMMUNICATIONS:
__ For local communications: 147.42 MHz simplex
__ For talk in: 146.85 MHz, 91.5 Hz tone
TASK LEADERS:
… KK4DID, Rodney, chairman
__ Download, review and assure meeting the ARRL Field Day packet requirements.
… KM4GLW, Suzy, safety officer
__ Develop safety plan and ensure its implementation.
__ Food coordination. Provide BBQ, chili and maybe ribs. Others bring sides, snacks, drinks and ice.
… Antenna design and construction
___ Plan two OCF dipoles, one vertical 20 meter antenna, end feed long wire. A drone will be used to aid installation.
… KM4TWA, James, computer operations
__ Develop reliable computer networked logging and back-up using N3FJP software.
__ Develop on-line sign up for operating and logging using this web site. Sub tab from this event tab. Completed.
… Other team members
__ Support team leaders as requested
TRAINING
__ N3FJP Logging software training
Status: Updated 7.5.2018